What should be avoided when installing the valve?

Time:2020-10-30
Valve is the most common equipment in chemical enterprises. It seems easy to install the valve, but if it is not executed according to the relevant technology, safety accidents will occur

Valves are the most common equipment in chemical enterprises. It seems easy to install valves, but if they are not executed in accordance with relevant technologies, safety accidents will occur...

No-no 1

Hydrostatic test was carried out under negative temperature in winter.
Consequence: the tube freezes quickly during the hydrostatic test, causing the tube to freeze.
Measures: water pressure test should be carried out as far as possible before winter application, and the water should be blown clean after pressure test, especially the water in the valve must be cleared in the clean, otherwise the valve will be light rust, heavy freeze crack.
During the hydrostatic test in winter, the project must be carried out at a positive indoor temperature and the water must be blown clean after the pressure test.

No-no 2

The pipeline system is not flushed carefully before completion, and the flow rate and speed cannot meet the requirements of pipeline flushing.
Water pressure strength test was even used instead of flushing.
Consequences: The water quality does not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline cross section.
Measure: Flush with the maximum flow rate or flow rate not less than 3m/s.The water color and transparency of the discharge outlet should be consistent with the visual measurement of the water color and transparency of the inlet.


No-no 3

Sewage, rainwater and condensate pipes shall be concealed without water closing test.
Consequences: may cause water leakage, and cause user losses.
Measures: The closed water test should be checked and accepted strictly according to the standard.Underground installation, ceiling, pipe and other hidden sewage, rainwater, condensate pipe to ensure that no leakage.

No-no 4

In the water pressure strength test and tightness test of pipeline system, only observe the change of pressure value and water level, and the inspection of leakage is not enough.
Consequences: Leakage occurs after the operation of the pipeline system, which affects the normal use.
Measures: When the piping system is tested in accordance with the design requirements and construction specifications, the pressure value or water level changes shall be recorded within the specified time, and in particular, the leakage shall be carefully checked.

No-no 5

Butterfly valve flanges use ordinary valve flanges.
Consequence: butterfly valve flange and the general valve flange size is not the same, some flange diameter is small, and butterfly valve disc is large, resulting in not open or hard to open the valve damage.
Measures: according to the actual size of the butterfly valve flange flange processing flange.

No-no 6

In the construction of the building structure, there are no reserved holes and embedded parts, or the reserved holes are too small in size and the embedded parts are not marked.
Consequence: in the construction of warm sanitation project, picking out the building structure, or even cutting off the reinforced bar, affecting the safety performance of the building.
Measures: Be familiar with the construction drawings of heating and sanitation project, and actively and seriously cooperate with the construction of reserved holes and embedded parts according to the installation requirements of pipes, supports and hangers, and refer to the design requirements and construction specifications for details.

No-no 7

During pipeline welding, the wrong opening of the pipe after the opposite port is not in a center line, no clearance is left for the opposite port, no groove is removed for the thick-wall pipe, and the width and height of the welding seam do not meet the requirements of the construction code.
Consequence: the wrong orifice of the pipe is not in a center line, which directly affects the welding quality and perception quality.No clearance is left for the counterpart, no slotting is done for the thick-walled pipe, and the welding strength cannot be reached if the width and height of the welding seam do not meet the requirements.
Measures: After welding the pipe to the other side, the pipe should be on the center line instead of the other side.A gap should be left at the opposite mouth;Thick - walled pipes should be slotted.In addition, the width and height of the weld shall be welded in accordance with the requirements of the code.

No-no 8

Pipelines are directly buried in frozen soil and untreated loose soil, and the piers are not properly spaced and located, or even in the form of dry code bricks.
Consequence: The pipe was damaged in the process of compaction of backfill earth due to unstable support, which caused rework and repair.
Measures: The pipe shall not be buried in frozen soil and loose soil without treatment. The distance between piers shall meet the requirements of construction code, and the supporting pad shall be firm. In particular, the pipe connection shall not bear shear force.Brick piers to use cement mortar masonry, ensure integrity, firm.

No-no 9

The material of the expansion bolts for fixing the pipe bracket is inferior, the aperture of the installation expansion bolts is too large or the expansion bolts are installed on the brick wall or even the light wall.
Consequences: Loose pipe support, pipe deformation, and even fall off.
Measures: qualified products must be selected for expansion bolts. If necessary, samples should be taken for test inspection. The diameter of expansion bolts installed should not be 2mm larger than the outside diameter of expansion bolts.

No-no 10

Flanges and gaskets for pipe connections are not strong enough, and the connecting bolts are short or thin in diameter.Rubber pads are used for heat pipes, double or bevel pads for cold water pipes, and flange gaskets protruding into the pipes.
Consequence: flange connection is not tight, even damaged, leakage phenomenon.The penetration of the flange gasket into the tube will increase the flow resistance.
Measures: flanges and gaskets used in pipelines must meet the requirements of working pressure in pipeline design.
Rubber asbestos gaskets should be used for flange gaskets of heating and hot water supply pipes;Rubber gasket should be used for flange gasket of water supply and drainage pipeline.
The gasket of the flange shall not protrude into the tube, and the outer circle to the flange bolt hole shall be appropriate.Bevel pads or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the diameter of the flange flange. The length of the bolt protruding nut should be 1/2 of the thickness of the nut.

No-no 11

Incorrect valve installation method.
For example, the water (steam) flow of globe valves or check valves is opposite to the sign, the stem is installed downward, horizontal check valves are installed vertically, the handle of rising stem gate valve or butterfly valve has no open and closed space, the stem of hidden valve is not oriented toward the inspection door.Consequences: valve failure, switch maintenance difficulties, valve stem down often cause water leakage.
Measures: Install in strict accordance with the valve installation instructions, keep the stem of the rising gate valve open height, fully consider the rotation space of the butterfly valve handle, all kinds of valve stem should not be lower than the horizontal position, let alone down.The hidden valve should not only set the inspection door to meet the needs of opening and closing the valve, but also the stem should face the inspection door.

No-no 12

The installation valve specifications and models do not meet the design requirements.
For example, the nominal valve pressure is less than the system test pressure;When the diameter of water supply branch pipe is less than or equal to 50mm, use gate valve;Cut-off valves are used in the dry and riser pipes for hot water heating.Butterfly valve is used for water suction pipe of fire pump.
Consequences: Affect the valve normal open and close and adjust resistance, pressure and other functions.Even caused damage to the valve during the operation of the system and forced repair.
Measures: Familiar with the application range of all kinds of valves, according to the design requirements to choose the valve specifications and models.Nominal valve pressure to meet the requirements of system test pressure.According to the requirements of the construction code: cut-off valve shall be used for the water supply branch pipe diameter less than or equal to 50mm;Gate valves should be used when pipe diameter is greater than 50mm.Hot water heating dry, vertical control valve should be used gate valve, fire water pump suction pipe should not be used butterfly valve.

No-no 13

The valve does not perform necessary quality inspection before installation.
Consequences: In the operation of the system, the valve switch is not flexible, the shutdown is not strict and the phenomenon of leakage (steam) occurs, causing rework and repair, and even affecting the normal water supply (steam).
Measure: Before installation, the valve should be tested for compressive strength and tightness.The quantity of each batch (same brand, same specification, same model) shall be randomly checked by 10% and not less than one.The strength and tightness test should be done one by one for the closed - circuit valve installed on the main pipe.The strength and tightness test pressure of the valve should comply with the "Construction Quality Acceptance Code for Building Water Supply, Drainage and Heating Engineering" (GB 50242-2002).

No-no 14

The main materials, equipment and products used in the construction are in lack of technical and quality appraisal documents or product certificates conforming to the current national or ministry standards.
Consequences: the project quality is not qualified, there are potential accidents, can not be delivered to use on schedule, must be reworked and repaired;Delay of construction, increase of manpower and material input.
Measures: The main materials, equipment and products used in water supply and drainage and heating and sanitation engineering shall meet the technical and quality identification documents or product qualification certificates issued by the state or the Ministry;The product name, model, specification, national quality standard code, date of manufacture, name and place of manufacturer, inspection certificate or code of the ex-factory product shall be indicated.

No-no 15

The valve inversion
Consequences: Check valve, throttle valve, pressure reducing valve, check valve and other valves have directionality, if installed in reverse, throttle valve will affect the service effect and life;Pressure relief valves do not work and check valves can be dangerous.
Measures: General valves, direction marks on the body;In case of no, the valve should be correctly identified according to the working principle.The valve chamber of the globe valve is asymmetrical, the fluid should be let from the bottom to the top through the valve mouth, so that the fluid resistance is small (determined by the shape), open to save effort (due to the medium pressure up), closed after the medium does not pressure packing, easy to repair.This is why the globe valve cannot be reversed.
Gate valves should not be inverted (i.e., handwheel down), as this can cause media to remain in the cover space for a long time, corrode the stem, and is No- No to certain process requirements.It is inconvenient to change packing at the same time.
Open stem gate valves should not be installed underground or the exposed stem may corrode due to moisture.
Lifting type check valve, when the installation to ensure that its disc vertical, in order to lift flexible.
Swing check valve, install to ensure its pin shaft level, so that the swing flexible.
Pressure relief valves should be installed upright in a horizontal pipe line, do not tilt in all directions.

No-no 16

Manual valve opening and closing, too much force
Consequences: light valve damage, serious safety accidents
Measure: The manual valve, its handwheel or handle, is designed according to ordinary manpower, taking into account the strength of the sealing surface and the necessary closing force.So you can't use a long lever or a long plank to move the plank.Some people are used to using the board hand, should be strict attention, do not exert too much force, otherwise easy to damage the sealing surface, or plate broken handwheel, handle.Open and close the valve, the force should be smooth, not impact.Some impact open and close high pressure valve components have been considered the impact and the general valve can not wait.For the steam valve, before opening, should be pre-heated, and exclude condensate, open, should be as slow as possible, so as not to occur water hammer phenomenon.When the valve is fully open, the handwheel should be reversed a little, so as to tighten between threads, so as not to loosen and damage.For open stem valves, remember stem positions when fully open and fully closed to avoid hitting the upper dead center when fully open.It is convenient to check whether it is normal when closed.If the valve does fall off, or between the valve core seal embedded larger debris, when the valve stem position is about to change.When the pipeline is first used, there are a lot of internal dirt, the valve can be slightly opened, using the high-speed flow of the medium, wash it away, and then gently closed (can not close quickly, violently closed, in case of residual impurities caught in the sealing cover), open again, so repeated many times, clean the dirt, then put into the normal work.Often open the valve, sealing surface may be sticky with dirt, when closed, also want to use the above method to flush clean, and then formally close.If the handwheel or handle is damaged or lost, it should be fitted immediately, and can not be replaced by the movable plate hand, so as to avoid damage to the valve stem square, not open and close properly, so as to cause accidents in production.Some media, cooled after the valve closed, so that the valve parts shrink, the operator should be closed at the appropriate time again, so that the sealing surface without fine seam, otherwise, the medium from the fine seam high-speed flow, it is easy to erosion sealing surface.During the operation, if the operation is found to be too strenuous, the reason should be analyzed.If packing is too tight, loosen appropriately. If stem is askew, advise repair.Some valves, in the closed state, the closure of the thermal expansion, causing difficulty in opening;If it must be opened at this time, unscrew the bonnet half to one turn to eliminate stem stress and then turn the plate.

No-no 17

Improper installation of valve in high temperature environment
Consequences: Causing a spill
Measures: The high-temperature valve above 200℃ is at room temperature when installed, but after normal use, the temperature rises, the bolt expands in heat, the gap increases, so it must be tightened again, called "hot tight", the operator should pay attention to this work, otherwise it is easy to leak.

No-no 18

Cold weather does not drain in time
Measures: when the weather is cold, the water valve should be closed for a long time, the water should be removed after the valve.After the steam valve stops steam, condensate should also be removed.The bottom of the valve is like a silk plug, it can be opened to drain.

No-no 19

Nonmetal valve with too much opening and closing force
Measure: nonmetal valve, some hard and brittle, some low strength, operation, open and close force can not be too big, especially can not make strong.Also be careful not to bump objects.

No-no 20

The new valve packing is too tight
Measures: when the new valve is used, the packing should not be pressed too tight, with no leakage as a degree, so as not to pressure the valve stem is too big, speed up the wear and tear, and open and close laboriously.The quality of valve installation directly affects use, so careful attention must be paid to valve direction and position, valve construction, valve protection, bypasses and instrumentation, and valve packing replacement.

No-no 21

The installation position has no operating space
Measures: the valve installation position must be convenient for operation;Even if the installation is temporarily difficult, the operator's long-term work should be considered.Best valve handwheel and chest even (generally 1.2 meters away from the operation floor), so, open and close the valve more energy saving.Landing valve hand wheel should be up, do not tilt, so as not to operate awkwardly.The wall machine depends on the valve of the equipment, also want to leave room for the operator to stand.To avoid relying on the sky operation, especially acid and alkali, toxic medium, otherwise very unsafe.

No-no 22

Hit a valve made of brittle material
Measures: installation and construction must be careful, do not hit the valve made of brittle materials.Before installation, check the valve to see if there is any damage, especially to the stem.Also turn a few times to see if the valve is skewed, because during transportation, the most prone to skew valve stem.Also remove debris from the valve.When the valve is hoisted, the rope should not be tied to the handwheel or stem to avoid damaging these parts. It should be tied to the flange.Be sure to clean the line to which the valve is attached.Iron oxide chips, sand, welding slag and other sundries can be blown by compressed air.These sundries, not only easy to scratch the sealing surface of the valve, including large particles sundries (such as welding slag), but also can block the small valve, make its failure.When installing the screw valve, the sealing filler (wire and lead oil or polytetrafluoroethylene raw material belt) should be wrapped on the pipe thread, do not get into the valve, in order to avoid the memory of the valve, affect the medium flow.When installing flanged valves, pay attention to tighten bolts symmetrically and evenly.Valve flange and pipe flange must be parallel, reasonable clearance, to avoid valve too much pressure, or even cracking.Particular attention should be paid to brittle materials and low strength valves.The valve to be welded with the pipe should be spot-welded first, then fully open the closed parts, and then welded dead.

No-no 23

The valve is not insulated and cooled
Action: Some valves also require external protection, which is insulation and cooling.Steam lines are sometimes added to heat insulation.
What kind of valves should be insulated or cooled depends on production requirements.In principle, where the valve medium to reduce the temperature is too much, will affect the production efficiency or freeze damaged valve, the need for insulation, or even heat;Where the valve bare, adverse to production or cause frost and other adverse phenomena, the need to keep cold.Insulation materials include asbestos, slag wool, glass wool, perlite, diatomite, vermiculite, etc.Keep cold material to have cork, perlite, foam, plastic.

No-no 24

Bypass not installed on trap
Measures: Some valves, in addition to the necessary protection facilities, also have bypasses and instrumentation.Bypass is installed to facilitate maintenance of the trap.Other valves may also be bypassed.Bypass installation depends on valve condition, importance, and production requirements.

No-no 25

Packing not replaced regularly
Measures: inventory valve, some packing is not good, and some with the use of media, it is necessary to replace the packing.
The valve faces thousands of different media, packing box is always filled with ordinary packing, but when used, must let the packing and the medium to adapt.
When changing packing, press in round by round.The seams of each ring shall be 45 degrees, and the joints of the rings and rings shall be staggered 180 degrees.The height of the packing shall allow for further compaction of the gland and, at the present time, the proper depth of the packing chamber at the lower gland, normally 10-20% of the total depth of the packing chamber.
For high demand valves, seam Angle is 30 degrees.The seam between the loops is staggered by 120 degrees.
In addition to the packing, can also according to the specific situation, USES the rubber o-ring (natural rubber resistant to 60 degrees Celsius under weak base, butyl eyes below 80 degrees Celsius oil resistant rubber, fluorine rubber resistance to a variety of corrosive medium under 150 degrees Celsius) three fold type teflon ring (below 200 degrees Celsius) strong corrosive medium resistance of nylon bowl ring (below 120 degrees Celsius, ammonia alkali resistant) forming filler.A layer of polytetrafluoroethylene raw material belt outside the common asbestos packing can improve the sealing effect and reduce the electrochemical corrosion of the valve stem.
When pressing the packing, turn the stem simultaneously to keep all sides even and prevent too much dead, tighten the gland evenly without tilting.


主站蜘蛛池模板: 国产亚洲欧美一区二区三区四区_99热综合_一区二区精彩视频_欧美一二三四五六七区_日韩免费视频在线观看_四虎一区二区_影音先锋黄色网址_成人hd | 亚洲三级毛片_91超在线_久久久久久久久久艹_天天操中文字幕_japanese老熟妇乱子伦视频_国产在线视频欧美_精品一区日韩_国产日韩欧美综合在线 | 国产福利免费看_天天人人干_色avav色av爱avav亚洲色拍_国产欧美一区二区久久性色99_久久久亚洲国产精品_播五月开心婷婷欧美综合_多人运动免费观看不用登录_靠比视频在线免费观看 | 精品av天堂毛片久久久_99热com_99re在线国产_夜色爽爽影院18禁妓女影院_亚洲国产片在线观看_麻豆91精品91久久久的内涵_最新中文字幕在线资源_日韩中文幕 | 亚洲a一区_看全色黄大色大片免费久久久_国产呻吟对白刺激无套视频在线_69pao视频_久久伊人精品天天_精品久久久久久久久久_伊人久久精品无码二区麻豆_善良的女儿在线观看 | 日本高清www色视频总站免费_少妇SPA推油被扣高潮_寡糖在线_美国三级日本三级久久99_亚洲av无码之国产精品网址_免费理论_男人天堂tv_黄色一片日本视频 | 国产裸体视频_好猛好深好爽喷水无码视频_久久久久成人片免费观看_午夜在线观看免费线无码视频_亚洲高清视频一区二区三区_欧美视频区_亚洲精品视频二区_中文字幕综合视频 | 激情伊人五月天久久综合_放荡少妇张开双腿任人玩_国产一区二区久久久_99国产在线精品_国产在线视频一区二区_成人一区二_成人一级视频在线观看_a成人毛片 | 在线观看亚洲av每日更新_伊人55_久久久久久久久久久久久久久99_国产午夜精品理论片_波多野结衣久久_国产碰碰_国产一级淫片久久久片a级_国产免费女同互wei观看 | 亚洲精品国产片_精品综合久久_色AV永久无码影院AV_一区一区视频_青青草午夜色影院_农村熟女大胆露脸自拍_黄色毛片a级_在线观看日韩中文字幕 | 人人人妻人人澡人人爽欧美一区_91亚洲精品久久久中文字幕_亚洲第一网址_国产粗语刺激对白性视频_国产成人99_国产精品久久久一区二区三区网站_国产日韩在线视看第一页_欧美25p | 5060午夜_中文字幕午夜精品一区二区三区_精品亚洲国产成人av不卡_日本三级bd高清_成人三级影院_91嫩草入口_а中文在线天堂_伊人无码高清 | 日本黄色一级_国产精品三p一区二区_国产成人片《羞羞》上映_欧美日日日日bbbbb视频_日本视频在线观看一区二区_开心亚洲五月丁香五月_免费国产视频在线观看_中文字幕视频在线播放 | 国产免费视频在线_亚洲视频2区_欧美黄色三级大片_久久国产偷任你爽任你_复仇者联盟4免费观看整片高清_欧美另类视频在线观看_国产热の有码热の无码视频_国产午夜无码视频在线观看 | 四虎在线免费观看_精品久久久亚洲_亚洲国产精品久久久久婷蜜芽_麻豆网在线观看_中国一级黄色毛片_久久综合久久鬼色_中文字幕在线_国产精品久久久久一区二区三区 | 91视频免费观看网址_黄色大片一区_国产精品一区久久久_亚洲精品色哟哟_最近中文字幕一区_婷婷综合缴情亚洲狠狠小说_国产成年无码AV片在线_日本最新一区 | 91撸视频_自拍亚洲欧美老师丝袜_免费网站v片在线亚洲_国产天美传媒性色AV_亚洲精品成人影院_亚洲性精品_www.欧美日韩_av大片免费观看 | 逼特视频_成人精品视频_国产黄片自拍亚洲AV_ww亚洲ww亚在线观看_国产亚洲AV无码AV男人的天堂_亚洲成色av网站午夜影视_2020国产成人精品视频_久热操视频 | 亚洲人a成www在线影院_久久动漫在线观看_亚洲再线_AV无码爆乳护士在线播放_五月天婷亚洲天综合网鲁鲁鲁_japansex久久高清精品_成人cosplay福利网站18禁_国产欧美日韩亚洲更新 | 2020av毛片_国产老熟女91pom_精品国产欧美日韩一区二区三区_69xxx在线观看_国产成aⅴ人高清精品久久久_伊人激情av一区二区三区_精品一区二区三区自拍图片区_国产精品区二区三区日本 | 欧美一区久久_亚洲精品一二三四区_特黄三级毛片_懂色av中文一区二区_在线播放成人av_国内啪啪_亚洲愉拍99热成人精品热久久_亚洲精品久久无码AV片软件 | 中文字幕日韩精品欧美一区_av国产精品毛片一区二区小说_国产黄色免费看_亚洲精品黑牛一区二区三区_成人亚洲免费_国产高清视频在线观看一区二区_91大神在线观看视频_久久久国产精品人人片99精片欧美一 | 精品玖玖玖_日本中文字幕在线免费观看_日韩草逼视频_BBW丰满大肥奶肥婆_国产真实乱XXXⅩ视频_草草影院第一页_欧美精品在欧美一区二区_午夜精选 | 亚洲人成色4444在线观看_美女视频黄又黄又免费高清_西游性淫片a级在线观看_欧美成a人片在线观看久_特级黄色毛片视频片子_青草久久久国产线免观_国产精品999在线观看_色欧美色美色一区二区在线 | 欧美城网站地址_99热超碰在线_一区二区三区在线免费播放_激情自拍网_亚洲国产精品午夜伦不卡_久久久精品中文_精品国产一区二区三区国产区_成年人在线免费视频观看 | 久久精品影视大全_国产欧美日韩视频_5060午夜一级_无码成人精品日本动漫纯H_zooslook欧美另类_在线成人www免费观看视频_eeusswww免费快播_国产一区自拍视频 | 精品一区二区三区91_国产黄网在线_国产精品熟妇一区二区三区四区_亚洲αv在线精品糸列_无遮挡边摸边吃奶边做的视频刺激_在线免费观看h视频_狠狠爱网_免费无码AV片在线观看软件 | 色哟哟网页_边啃奶头边躁狠狠躁_欧美精品一区二区三区四区五区_中文字幕亚洲一区二区三区_亚洲图片偷拍自拍_91美剧_精品一区二区日韩_欧洲在线免费视频 | 亚洲国产成人精品福利无码_亚洲免费视频网_黄色影院国产_www.亚洲视频_av男人在线东京天堂_国产丰满大波大屁股熟女_91在线勾搭足浴店女技师_欧美综合自拍亚洲综合图片区 | JAPAN日本人妻熟老太_欧美成人精品第一区二区三区_国产不卡在线_日日日操_国产精品久久a_日本成人在线网_爆乳护士一区二区三区在线播放_色综合视频一区中文字幕 | 天堂俺去俺来也www_日本一区二区久久免费黑人精品_日韩a片r级无码中文字幕_久久AV超清_亚洲视频在线观看不卡_国产亚洲精品美女久久久_亚洲第一在线_天天操综合网 | 超碰97成人_97在线视频免费人妻_韩国免费一区_无码国产色欲XXXX视频_国产精品久久久久久99999_日韩国产亚洲欧美成人图片_午夜宅男在线观看_欧美日韩综合一区二区三区 | 欧美日本中文字幕_小峰色戒网站_狠狠的干性视频_国产精品麻豆视频_本道久久综合无码中文字幕_国产一区二区美女_青青网站_亚洲视频在线a | 中文字幕日韩精品欧美一区_av国产精品毛片一区二区小说_国产黄色免费看_亚洲精品黑牛一区二区三区_成人亚洲免费_国产高清视频在线观看一区二区_91大神在线观看视频_久久久国产精品人人片99精片欧美一 | 国产免费自拍av_亚洲成人蜜桃_中文字幕乱码亚洲无线三区_无限动漫视频在线观看免费动漫_真人性囗交69视频_久久婷婷国产综合一区二区_孕妇奶水仑乱A级毛片在线播放_国产精品99久久99久久久二 | 亚洲午夜视频_久久78_麻豆国产原创视频在线播放_成人在线视频免费播放_远方的山楂树免费观看视频48集_亚洲另类春色国产精品_国产影院一区二区三区_无套内射AV五十区 | 擼擼色在线看观看免费_日本中文字幕在线视频观看_欧洲免费毛片_爱操视频在线观看_一本一道在线人妻中文字幕_日本欧美久久久免费播放网_欧美一性一交_日本边添边摸边做边爱的网站 | 久久一区二区精品_欧美精品福利在线_久久99精品国产99久久6_麻豆一区二区三区蜜桃免费_欧美乱妇高清免费96欧美乱妇高清_久操97_欧美无玛_欧美日韩一区二区在线 | 国产奶水一区二区三区_pornhub欧美在线观看_日韩欧美国产1_亚洲大片免费观看_日本床戏视频_a国产精品_天天av天天翘天天综合网色鬼_日b视频在线观看 | 成年免费a级毛片免费看丶_99久久爱re热6在播放_99网站_99精品99久久久久久宅男_国产超碰在线_亚洲春色在线视频_国内露脸8mav_日日插夜夜操 | 先锋影音在线资源站91_国产免费一级淫片_四虎黄色网址_久草热8精品视频在线观看_大学生一级片_国产在线a_欧美特黄特色视频_精品成人乱色一区二区 |